2008 News
2008
November 22th-29th: VEGA Observing run (O. Chesneau, F.
Millour, D. Mourard)
2008 October 3rd-12th:
VEGA Observing run (K. Perraut, D. Mourard)
2008 July 27th-August 9th: VEGA Observing run (I.
Tallon, Ph. Stee, D. Mourard)
2008 May18th-June5th: VEGA Observing run
2008 May 4th:
Preparation of the next VEGA run (may 17th to june 4th)
March 6th: VEGA meeting in our new lab. H. FIZEAU (OCA,
UNS, CNRS)
WINTER 2007-2008 (December '07 to march '08)
- The team is working on the data reduction mainly with
a lot of complications on the reduction pipeline. The
main problems are the correction of the photon
centroiding hole, the estimation of the low frequency
energy due to the bad shape of the pupils and the poor
quality of the data.
- Great progresses however have been made to secure the
pipeline: the adaptation to the new data files is almost
done and we are now finishing the preprocessing step
where bad photons are removed. A report will be
distributed soon.
- The data set on which we are working is made of three
sequences:
- gamma Cas, High Spectral Resolution (W1W2)
- gamma Peg + calibrator (4 sets in alternance) (W1W2)
- zeta Tau + calibrator E1W2 and W1W2
- We are also working on the new central control
software and improvements in the instrument, such as a
new filter wheel for neutral densities and studies for
the possibility of new dichroic plates (IR/VIS CHARA
dichroics).
|
|